failure to respond or late response
on 16 Aug 2019
Last Applicant/ Owned by
11147 Beograd
XP
Serial Number
79248189 filed on 14th May 2018
Registration Number
N/A
Filing Basis
No Filing Basis
Disclaimer
NO DATA
The mark consists of three words in standard characters: Light, for and life Lighting apparatus, particularly: LED lights, projectors, lighting systems, electric lamps, lamps, suspended fixtures, lamps for special use in medical and hospital areas, ceiling fixtures, outdoor fixtures, indoor fixtures, fixtures for industrial installations, fixtures for spaces where working conditions are particula Read More
Lighting apparatus, particularly: LED lights, projectors, lighting systems, electric lamps, lamps, suspended fixtures, lamps for special use in medical and hospital areas, ceiling fixtures, outdoor fixtures, indoor fixtures, fixtures for industrial installations, fixtures for spaces where working conditions are particularly harsh including clean rooms, lighting fixtures in exhibition areas
Design of studies, particularly: in the field of architecture, consulting, interior design, industrial designs, packaging design, project studies, technical studies, engineering, mechanical research, lighting system design, lighting design advice, lighting equipment programming and commissioning, new product development
No 79248189
No Service Mark
No
No
No
No
No
No
No
No
No
The mark consists of three words in standard characters: Light, for and life
Status Date | Action Taken |
---|---|
05th Sep 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
17th Aug 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
16th Aug 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
12th Jun 2020 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
27th May 2020 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
27th May 2020 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
16th Aug 2019 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
16th Aug 2019 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
02th Feb 2019 | REFUSAL PROCESSED BY IB |
13th Jan 2019 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |