on 11 Apr 2024
Last Applicant/ Owned by
6250 BROOK HOLLOW PARKWAY
NORCROSS
GA
30071
Serial Number
90241602 filed on 08th Oct 2020
Registration Number
N/A
Correspondent Address
Austin Padgett
Filing Basis
1. intent to use
2. intent to use current
Disclaimer
NO DATA
Lighting products, namely, work light bulbs; work and safety lighting products, namely, work flashlights, light bulbs, portable worklights, and light strings Retail store and distributorship services for construction supplies featuring goods for non residential, residential and industrial construction, namely, concrete products, chemicals, fasteners and accessories, including products for formingRead More
Construction jobsite training, namely, classroom instruction, on-site instruction, courses, seminars, and workshops in the fields of construction and construction jobsite safety
custom rebar fabrication
Construction and industrial services, namely, construction equipment and tool rental, namely, rental of hand and power tools; tilt up construction services, namely, forming, shoring, bracing and other aspects of tilt up construction; tool repair services
Retail store and distributorship services for construction supplies featuring goods for non residential, residential and industrial construction, namely, concrete products, chemicals, fasteners and accessories, including products for forming, shoring and tilt up construction, hand and power tools, ladders, specialty hardware, sealants, adhesives, waterproofing, building envelope systems, engineered and specified materials used in all commercial, residential and industrial construction, cutting tools, rebar, safety and fall arrest equipment, screws, bolts and other fasteners, drainage pipe, geo synthetics, erosion and sediment control, building materials and home improvement products for remodeling contractors, tradesmen and do it yourself customers, and products for custom rebar fabrication, jobsite training, equipment and tool rental, and tool repair
Non metallic building materials, namely, bagged natural stone, bagged gravel, bagged sand; non-metal storm water pollution prevention products used as construction materials, namely, silt fencing; geotextiles and erosion control products, namely, sand bags, dewatering bags, sediment control socks
Lighting products, namely, work light bulbs; work and safety lighting products, namely, work flashlights, light bulbs, portable worklights, and light strings
Specialty gloves, namely, gloves for protection against accidents; tripods; work and safety lighting products, namely, emergency warning lights and trouble lights
Hand tools and attachments for hand tools, namely, blades for hand saws, drill bits for hand drills, shovels, brooms and brushes attachments for hand tools, rakes; hand tools, namely, planers, files, bolt cutters, utility knives, multitools, caulk guns, grease guns, chisels, clamps, vises, trowels, concrete edgers, concrete groovers, concrete jointers, concrete finishing brooms, concrete finishing brushes, concrete floats, concrete darbies, concrete screeds, concrete spreaders, floor scrapers, floor blades, hammers, striking tools, hand saws, hack saws, squeegees, asphalt lutes, asphalt rakes, hand sprayers, landscape rakes, shovels, masonry mud mixers, pliers, pry bars, crow bars, nail pullers, stake pullers, screwdrivers, nut drivers, hex keys, socket wrenches, ratchets, staplers, tackers, pipe dies, pipe threaders, rebar banders, rebar tying tools, box wrenches, crimpers, axes, hatchets, digging bars, post hole diggers, augers; Hand-operated sprayers for chemicals and other liquids
Wax-based, oil-based, and water-based floor cleaning compounds, all containing chemicals, in the nature of floor sweeping compounds to control dirt, dust, and debris and to prevent dirt, dust and debris from becoming airborne and resettling
No 90241602
No Service Mark
No 041079.__
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
11th Apr 2024 | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED |
05th Apr 2024 | EXAMINERS AMENDMENT -WRITTEN |
05th Apr 2024 | EXAMINERS AMENDMENT E-MAILED |
05th Apr 2024 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
05th Apr 2024 | EXAMINER'S AMENDMENT ENTERED |
05th Apr 2024 | APPROVED FOR PUB - PRINCIPAL REGISTER |
28th Mar 2024 | ASSIGNED TO EXAMINER |
27th Mar 2024 | ASSIGNED TO EXAMINER |
27th Mar 2024 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
04th Oct 2023 | ASSIGNED TO EXAMINER |