tm logo
SOLAR SAGA
Dead/Abandoned
ABANDONED - FAILURE TO RESPOND OR LATE RESPONSE

failure to respond or late response

on 31 Mar 2020

Last Applicant/ Owned by

Tongsheng, Dalang St., Longhua Dist.

Shenzhen

CN

518000

Serial Number

87761256 filed on 18th Jan 2018

Registration Number

N/A

Correspondent Address

SUN, ZHONGWEI

Filing Basis

1. intent to use

2. intent to use current

Disclaimer

"SOLAR"

SOLAR SAGA

Decontamination of hazardous materials; Destruction of waste and trash; Generation of power; Leasing of energy generating equipment; Nuclear fuel reprocessing; Production of energy; Recycling of waste and trash; Rental of electricity generators; Sorting of waste and recyclable material; Upcycling in the nature of waste recycling; Waste treatment The mark consists of the stylized wording "SOLAR SARead More

Classification Information


Class [040]
Treatment & Processing of Materials Services


Decontamination of hazardous materials; Destruction of waste and trash; Generation of power; Leasing of energy generating equipment; Nuclear fuel reprocessing; Production of energy; Recycling of waste and trash; Rental of electricity generators; Sorting of waste and recyclable material; Upcycling in the nature of waste recycling; Waste treatment


First Use Date in General

18th Jan 2018

First Use Date in Commerce

18th Jan 2018

Mark Details


Serial Number

No 87761256

Mark Type

No Service Mark

Attorney Docket Number

No 18-00137-M4

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Design Code(s)

01.05.01 -

Sun, rising or setting (partially exposed or partially obstructed)

Description of Design Search

The mark consists of the stylized wording "SOLAR SAGA" with a shining sun above.

Legal History


Show more

Status DateAction Taken
01st Apr 2020ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
31st Mar 2020ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
13th Sep 2019SU - NON-FINAL ACTION - WRITTEN
13th Sep 2019NOTIFICATION OF NON-FINAL ACTION E-MAILED
13th Sep 2019NON-FINAL ACTION E-MAILED
30th Aug 2019STATEMENT OF USE PROCESSING COMPLETE
30th Aug 2019CASE ASSIGNED TO INTENT TO USE PARALEGAL
02th Aug 2019USE AMENDMENT FILED
02th Aug 2019TEAS STATEMENT OF USE RECEIVED
01st Feb 2019NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED