granted
on 30 Oct 2023
Last Applicant/ Owned by
217 Miracle Strip Parkway, Suite 112
Fort Walton Beach
FL
32548
Serial Number
88921221 filed on 18th May 2020
Registration Number
N/A
Correspondent Address
Frank M. Caprio
Filing Basis
1. intent to use
2. intent to use current
Disclaimer
NO DATA
Color is not claimed as a feature of the mark. ROGUE RAPID SCIF Construction services relating to metal buildings; General and custom construction, installation, maintenance and repair, of metal buildings; General and custom construction, installation, maintenance and repair, of modular and portable buildings; General and custom construction, installation, maintenance and repair, of modular and Read More
Construction services relating to metal buildings; General and custom construction, installation, maintenance and repair, of metal buildings; General and custom construction, installation, maintenance and repair, of modular and portable buildings; General and custom construction, installation, maintenance and repair, of modular and portable buildings namely, SCIFs (Secure Compartmentalized Information Facilities)
Portable metal modular buildings; Portable metal modular buildings equipped with technology, equipment and furniture for use as a secure facility; Prefabricated metal buildings; Portable metal modular buildings, namely, portable metal modular SCIFs (Secure Compartmentalized Information Facilities)
No 88921221
No Service Mark
No 221256401007
No
No
No
No
No
No
No
No
16.03.01 -
Cameras, including motion picture cameras; photographic lenses
26.17.01 -
Straight line(s), band(s) or bar(s)
26.17.05 -
Horizontal line(s), band(s) or bar(s)
27.03.05 -
Representations of objects forming letters or numerals, including punctuation
The mark consists of on the first line, the word "ROGUE" in stylized upper case letters, with the "O" having the appearance of a camera shutter formed by a series of triangles with the outer edge rounded; on the second line, in smaller stylized upper case font the word "RAPIDSCIF" with an empty space in the upper third of each letter.
Status Date | Action Taken |
---|---|
31st Oct 2023 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
30th Oct 2023 | SOU EXTENSION 5 GRANTED |
23rd Oct 2023 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
12th Oct 2023 | SOU TEAS EXTENSION RECEIVED |
12th Oct 2023 | SOU EXTENSION 5 FILED |
14th Apr 2023 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
12th Apr 2023 | SOU TEAS EXTENSION RECEIVED |
12th Apr 2023 | SOU EXTENSION 4 FILED |
12th Apr 2023 | SOU EXTENSION 4 GRANTED |
14th Oct 2022 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |