failure to respond or late response
on 26 Mar 2020
Last Applicant/ Owned by
2780 Benner Pike
Bellefonte
PA
16823
Serial Number
88473872 filed on 14th Jun 2019
Registration Number
N/A
Correspondent Address
VARUN SHEKHAR
BABST CALLAND CLEMENTS & ZOMNIR, PC
603 STANWIX STREET, 6TH FLOOR
TWO GATEWAY CENTER, 6TH FLOOR
PITTSBURGH, PA 15222
Filing Basis
1. intent to use
2. intent to use current
Disclaimer
NO DATA
Construction of buildings, namely, airports, office or residence towers, subway or railway stations, parking structures, hotels, and museums; construction of public infrastructural structures, namely, roads, expressways, tunnels, subway or railway lines, ports, docks, dikes, canals, piers and bridges; construction of structures involved in energy generation, namely, hydroelectric power stations, tRead More
Construction of buildings, namely, airports, office or residence towers, subway or railway stations, parking structures, hotels, and museums; construction of public infrastructural structures, namely, roads, expressways, tunnels, subway or railway lines, ports, docks, dikes, canals, piers and bridges; construction of structures involved in energy generation, namely, hydroelectric power stations, thermal power stations, and nuclear power stations; excavation of trenches or walls in the ground; construction services, namely, installation of structural foundations; foundation contractor services; ground treatment and ground improvement services, namely, cement or chemical grouting; installation of deep foundations; specialty geotechnical construction, installation of earth retention and slope stabilization systems using rock and soil anchors; land reclamation
No 88473872
No Service Mark
No
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
27th Mar 2020 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
26th Mar 2020 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
13th Sep 2019 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
13th Sep 2019 | NON-FINAL ACTION E-MAILED |
13th Sep 2019 | NON-FINAL ACTION WRITTEN |
06th Sep 2019 | ASSIGNED TO EXAMINER |
26th Jun 2019 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |