on 18 Oct 2022
Last Applicant/ Owned by
4725 Hwy 28E
Pineville
LA
71360
Serial Number
97037521 filed on 21st Sep 2021
Registration Number
6876807 registered on 18th Oct 2022
Correspondent Address
R. DEVIN RICCI
Filing Basis
1. use application currently
Disclaimer
NO DATA
Construction of substation assemblies, structural components and skid-mounted substations The mark consists of a circle with an angled semi-circle on the left side and an opposingly angled semi-circle on the right side, each separated from each other by a white wedge between the two, and wherein a white line radiates upwards from the bottom of each semi-circle towards the middle in the silhouetteRead More
High-voltage substation steel support structures in the nature of steel plates and towers for transmitting electricity and communications
23rd Jun 2021
23rd Jun 2021
Construction of substation assemblies, structural components and skid-mounted substations
23rd Jun 2021
23rd Jun 2021
Custom fabrication of substation assemblies, structural components and skid-mounted substations as well as tapered tubular and standard shape transmission structures
23rd Jun 2021
23rd Jun 2021
Engineering; engineering design services; Engineering services concerning development, detailing, and planning of apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity
23rd Jun 2021
23rd Jun 2021
No 97037521
No Service Mark
No 23692-61
No
No
No
No
No
No
No
No
16.01.02 -
Posts or lines for telephone, telegraph or electricity
26.01.13 -
Two circles
26.01.21 -
Circles that are totally or partially shaded
26.05.14 -
Three triangles
26.05.25 -
Triangles with one or more curved sides
26.17.12 -
Chevrons and angles
The mark consists of a circle with an angled semi-circle on the left side and an opposingly angled semi-circle on the right side, each separated from each other by a white wedge between the two, and wherein a white line radiates upwards from the bottom of each semi-circle towards the middle in the silhouette of power pole.
Status Date | Action Taken |
---|---|
18th Oct 2022 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
18th Oct 2022 | REGISTERED-PRINCIPAL REGISTER |
02th Aug 2022 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
02th Aug 2022 | PUBLISHED FOR OPPOSITION |
13th Jul 2022 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
24th Jun 2022 | APPROVED FOR PUB - PRINCIPAL REGISTER |
23rd Jun 2022 | ASSIGNED TO EXAMINER |
26th Oct 2021 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
24th Oct 2021 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
24th Sep 2021 | NEW APPLICATION ENTERED IN TRAM |