on 13 Dec 2022
Last Applicant/ Owned by
GPO Box 5247 Brisbane QLD 4001
AU
Serial Number
79316788 filed on 06th Jul 2021
Registration Number
6920144 registered on 13th Dec 2022
Correspondent Address
Gregory N. Weisman
Filing Basis
No Filing Basis
Disclaimer
NO DATA
The mark consists of a lightning bolt design superimposed over two offset semicircles. Batteries; Lithium sulphur batteries; Lithium Metal Batteries, Flexible form batteries; 3D Printed Batteries, Batteries incorporating boron nitride nanotubes; Battery components for Lithium Sulphur, Lithium ion, Lithium Metal and Lithium Air batteries being cathodes, cathodes with nanomaterial coatings, batteryRead More
Batteries; Lithium sulphur batteries; Lithium Metal Batteries, Flexible form batteries; 3D Printed Batteries, Batteries incorporating boron nitride nanotubes; Battery components for Lithium Sulphur, Lithium ion, Lithium Metal and Lithium Air batteries being cathodes, cathodes with nanomaterial coatings, battery separators, battery separators with nanomaterial coatings and anodes made of metal or metal alloys; Components for metal and metal composite anodes and cathodes being anodes containing Lithium, Sodium, aluminium or potassium or a combination of those, and cathodes containing sulphur, carbon, or lithium metal oxides or a combination of those for use in batteries and supercapacitors, battery separators, battery separators with nanomaterial coatings and anodes made of metal alloys; components for use in supercapacitors and hybrid supercapacitor batteries, being cathodes, cathodes with nanomaterial coatings, battery separators, battery separators with nanomaterial coatings, anodes made of metal or metal alloys, and anodes with nanomaterial coatings
No 79316788
No Service/Collective Mark
No 5479.0002
No
No
No
No
No
No
No
No
01.15.02 -
Lightning or electricity
26.01.06 -
Semi-circles
26.01.13 -
Two circles
26.01.21 -
Circles that are totally or partially shaded
The mark consists of a lightning bolt design superimposed over two offset semicircles.
Status Date | Action Taken |
---|---|
24th Apr 2023 | FINAL DECISION TRANSACTION PROCESSED BY IB |
31st Mar 2023 | FINAL DISPOSITION NOTICE SENT TO IB |
30th Mar 2023 | FINAL DISPOSITION PROCESSED |
13th Mar 2023 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
13th Dec 2022 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
13th Dec 2022 | REGISTERED-PRINCIPAL REGISTER |
03rd Oct 2022 | NOTIFICATION PROCESSED BY IB |
27th Sep 2022 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
27th Sep 2022 | PUBLISHED FOR OPPOSITION |
07th Sep 2022 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |