on 12 May 2020
Last Applicant/ Owned by
Yuhuan Zhejiang
CN
Serial Number
79262018 filed on 28th Apr 2019
Registration Number
6050242 registered on 12th May 2020
Correspondent Address
Jonathan G. Morton
Filing Basis
No Filing Basis
Disclaimer
NO DATA
The mark consists of a shaded circle with a vertical line extending upwards from the circle ending at the center of a perpendicular horizontal line. Surrounding the circle and extending below are two shaded rectangles each on opposite sides of the shaded circle and each on an angle with a circular carved out portion at the top of each rectangle to expose the aforementioned shaded circle in the cenRead More
Nozzles of metal, namely, wash down spray nozzles for commercial and industrial use of metal, non-automatic fueling nozzles of metal; jets of metal being wash down spray nozzles for commercial and industrial use of metal; ducts of metal, for central heating installations; water-pipes of metal; elbows of metal for pipes; drain pipes of metal; valves of metal, other than parts of machines; pipework of metal; water-pipe valves of metal; ducts of metal for ventilating and air-conditioning installations
No 79262018
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
14.01.01 -
Tubes, pipes, pipe fittings
14.01.25 -
Other heavy hardware articles
The mark consists of a shaded circle with a vertical line extending upwards from the circle ending at the center of a perpendicular horizontal line. Surrounding the circle and extending below are two shaded rectangles each on opposite sides of the shaded circle and each on an angle with a circular carved out portion at the top of each rectangle to expose the aforementioned shaded circle in the center of the design.
Status Date | Action Taken |
---|---|
03rd Oct 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
16th Sep 2020 | FINAL DISPOSITION PROCESSED |
16th Sep 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
12th Aug 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
12th May 2020 | REGISTERED-PRINCIPAL REGISTER |
25th Feb 2020 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
25th Feb 2020 | PUBLISHED FOR OPPOSITION |
22nd Feb 2020 | NOTIFICATION PROCESSED BY IB |
05th Feb 2020 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
05th Feb 2020 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |