failure to respond or late response
on 19 Jul 2019
Last Applicant/ Owned by
2/F Building 5 Taijiang Industrial Park
Cangshan, Fuzhou City
CN
350007
Serial Number
88100026 filed on 31st Aug 2018
Registration Number
N/A
Correspondent Address
LIN ZHIWEI
Filing Basis
1. use application currently
Disclaimer
NO DATA
The mark consists of The graphic is a parallelogram, a triangle, a trapezoidal combination, which is a letter 'H' deformation design, with English 'HARVEST LAND' below the figure. Color is not claimed as a feature of the mark. Athletic apparel, namely, shirts, pants, jackets, footwear, hats and caps, athletic uniforms; Athletic shoes; Bath robes; Bonnets; Boots; Children's and infant's apparel, Read More
Athletic apparel, namely, shirts, pants, jackets, footwear, hats and caps, athletic uniforms; Athletic shoes; Bath robes; Bonnets; Boots; Children's and infant's apparel, namely, jumpers, overall sleepwear, pajamas, rompers and one-piece garments; Clothing, namely, thobes; Cravats; Evening dresses; Fingerless gloves; Footwear; Halloween costumes; Infant wearable blankets; Neck scarves; Rain hats; Rain suits; Running shoes; Sandals and beach shoes; Shirt-jacs; Shower caps; Ski gloves; Soccer shoes; Socks and stockings; Sports jerseys and breeches for sports; Stoles; Swimming costumes; Waist bands; Wedding gowns; Wetsuits for surfing
10th May 2016
10th May 2016
No 88100026
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
26.05.21 -
Triangles that are completely or partially shaded
26.13.13 -
Two quadrilaterals
26.13.21 -
Quadrilaterals that are completely or partially shaded
27.03.01 -
Geometric figures forming letters or numerals, including punctuation
The mark consists of The graphic is a parallelogram, a triangle, a trapezoidal combination, which is a letter 'H' deformation design, with English 'HARVEST LAND' below the figure.
Status Date | Action Taken |
---|---|
19th Jul 2019 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
19th Jul 2019 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
21st Dec 2018 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
21st Dec 2018 | NON-FINAL ACTION E-MAILED |
21st Dec 2018 | NON-FINAL ACTION WRITTEN |
13th Dec 2018 | ASSIGNED TO EXAMINER |
11th Sep 2018 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
10th Sep 2018 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
04th Sep 2018 | NEW APPLICATION ENTERED IN TRAM |