on 15 Dec 2020
Last Applicant/ Owned by
City Plaza, Shi Li Pu, Chaoyang District
100025 Beijing
CN
Serial Number
79264462 filed on 18th Jun 2019
Registration Number
6218852 registered on 15th Dec 2020
Filing Basis
No Filing Basis
Disclaimer
NO DATA
The mark consists of the stylized word "GEOLITE". Color is not claimed as a feature of the mark. Dynamos; electric pumps for heating installations; solar batteries manufacturing machines and systems, namely, solar batteries manufacturing machines; photovoltaic water pumps for spa, baths, whirlpools, swimming pools, water filtering units; semiconductor manufacturing machines and systems, namely, Read More
Dynamos; electric pumps for heating installations; solar batteries manufacturing machines and systems, namely, solar batteries manufacturing machines; photovoltaic water pumps for spa, baths, whirlpools, swimming pools, water filtering units; semiconductor manufacturing machines and systems, namely, semiconductor wafer processing equipment; machines and apparatus for wind power generation, namely, wind powered electricity generators and windmills
Batteries and cells, namely, batteries, dry cells and wet cells; solar batteries; computer software, recorded for controlling and monitoring solar generators; computer programs in the nature of downloadable software for controlling and monitoring hydraulic power generators; accumulator jars; battery chargers; electric accumulators
Solar collectors for heating; air conditioning apparatus; hot water space heating apparatus
No 79264462
No Service/Collective Mark
No 190307GEOL-U
No
No
No
No
No
No
No
No
The mark consists of the stylized word "GEOLITE".
Status Date | Action Taken |
---|---|
24th Jan 2022 | INTERNATIONAL REGISTRATION RENEWED |
24th Apr 2021 | FINAL DECISION TRANSACTION PROCESSED BY IB |
04th Apr 2021 | PARTIAL INVALIDATION PROCESSED BY THE IB |
22nd Mar 2021 | GENERIC MADRID TRANSACTION CREATED |
22nd Mar 2021 | GENERIC MADRID TRANSACTION SENT TO IB |
15th Mar 2021 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
15th Dec 2020 | REGISTERED-PRINCIPAL REGISTER |
10th Oct 2020 | REFUSAL PROCESSED BY IB |
29th Sep 2020 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
29th Sep 2020 | PUBLISHED FOR OPPOSITION |