failure to respond or late response
on 15 Jul 2022
Last Applicant/ Owned by
I-00044 FRASCATI (RM)
IT
Serial Number
79316893 filed on 02th Apr 2021
Registration Number
N/A
Filing Basis
1. filing basis filed as 66 a
Disclaimer
"FERRO - SWEET"
"FERRO - SWEET" The color(s) white, magenta and purple is/are claimed as a feature of the mark. Dietary supplements consisting primarily of iron; vitamin supplements; food supplements; nutritional supplements; liquid vitamin supplements; liquid nutritional supplements; vitamin preparations; vitamin drops; syrups for pharmaceutical purposes for the treatment of iron-deficiency The mark consists Read More
Dietary supplements consisting primarily of iron; vitamin supplements; food supplements; nutritional supplements; liquid vitamin supplements; liquid nutritional supplements; vitamin preparations; vitamin drops; syrups for pharmaceutical purposes for the treatment of iron-deficiency
No 79316893
No Service/Collective Mark
No
No
No
No
No
Yes
Yes
No
No
05.05.25 -
Other flowers including daffodils and irises
26.05.03 -
Incomplete triangles (must have two angles)
26.05.28 -
Miscellaneous designs with overall triangular shape
26.11.21 -
Rectangles that are completely or partially shaded
26.17.09 -
Curved line(s), band(s) or bar(s)
The mark consists of a shape of a rectangle with shades of magenta and purple, inside is placed the wording ?lron Sweet" in lowercase except for the capital letters "F" and "S", in fancy and white characters. Below is the word "vanda", in lower case, in white and fancy characters, as well as a white stylized design with small stylized magenta flowers.
Status Date | Action Taken |
---|---|
04th Jan 2023 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
04th Jan 2023 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
15th Jul 2022 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
15th Jul 2022 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
22nd May 2022 | NEW REPRESENTATIVE AT IB RECEIVED |
15th Jan 2022 | REFUSAL PROCESSED BY IB |
27th Dec 2021 | REFUSAL PROCESSED BY MPU |
27th Dec 2021 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
01st Dec 2021 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
30th Nov 2021 | NON-FINAL ACTION WRITTEN |