failure to respond or late response
on 08 Mar 2022
Last Applicant/ Owned by
Town of Ceramic Industry,
CN
Serial Number
79317495 filed on 02th Sep 2019
Registration Number
N/A
Correspondent Address
Beijing Bonarise; Intellectual Property
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
The transliteration of the non-Latin characters in the mark is: DONGPENG. Upholstery repair; upholstering; painting, interior and exterior; electric appliance installation and repair; installation and repair of air-conditioning apparatus; office machines and equipment installation, maintenance and repair; burglar alarm installation and repair Building timber; marble; artificial stone; cement; roRead More
Upholstery repair; upholstering; painting, interior and exterior; electric appliance installation and repair; installation and repair of air-conditioning apparatus; office machines and equipment installation, maintenance and repair; burglar alarm installation and repair
Building timber; marble; artificial stone; cement; roofing tiles, not of metal; construction materials, not of metal; binding agents for making briquettes
No 79317495
No Service Mark
No
No
No
No
No
Yes
Yes
No
No
01.05.25 -
Other representations of the sun
03.15.01 -
Eagles
03.15.24 -
Stylized birds and bats
03.17.16 -
Heads of birds
26.01.21 -
Circles that are totally or partially shaded
26.01.28 -
Miscellaneous circular designs with an irregular circumference
28.01.03 -
Japanese and Chinese characters Formerly Inscriptions in Chinese, Japanese, Korean, Vietnamese or other Asian characters
Status Date | Action Taken |
---|---|
11th Jan 2023 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
11th Jan 2023 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
09th Mar 2022 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
08th Mar 2022 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
08th Mar 2022 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
10th Sep 2021 | REFUSAL PROCESSED BY IB |
24th Aug 2021 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
24th Aug 2021 | REFUSAL PROCESSED BY MPU |
24th Aug 2021 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
23rd Aug 2021 | NON-FINAL ACTION WRITTEN |