tm logo
CYPRESS ENERGY PARTNERS
Dead/Cancelled
CANCELLED - SECTION 8

section 8

on 29 Dec 2023

Last Applicant/ Owned by

5727 S. Lewis Avenue, Suite 500

Tulsa

OK

74105

Serial Number

85763230 filed on 25th Oct 2012

Registration Number

5223381 registered on 13th Jun 2017

in the Principal Register

Correspondent Address

PENINA MICHLIN CHIU

FREDERIC DORWART, LAWYERS

124 E 4TH ST

TULSA, OK 74103-5027

Filing Basis

1. intent to use

2. use application currently

Disclaimer

"ENERGY PARTNERS"

CYPRESS ENERGY PARTNERS

"ENERGY PARTNERS" Color is not claimed as a feature of the mark. pumping of waste fluids produced in connection with oil and gas production The mark consists of two drops of water with a Cypress tree inside one of the water drops and the stylized wording "CYPRESS ENERGY PARTNERS" underneath the water drops. The color grey indicates background and is not part of the mark.

Classification Information


Class [037]
Construction and Repair Services


pumping of waste fluids produced in connection with oil and gas production


First Use Date in General

31st Dec 2012

First Use Date in Commerce

31st Dec 2012

Mark Details


Serial Number

No 85763230

Mark Type

No Service Mark

Attorney Docket Number

No 2219.05

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Design Code(s)

01.15.18 -

More than one drop including teardrops or raindrops

05.01.25 -

Other trees or bushes

Description of Design Search

The mark consists of two drops of water with a Cypress tree inside one of the water drops and the stylized wording "CYPRESS ENERGY PARTNERS" underneath the water drops. The color grey indicates background and is not part of the mark.

Legal History


Show more

Status DateAction Taken
29th Dec 2023CANCELLED SEC. 8 (6-YR)
13th Jun 2022COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
13th Jun 2017REGISTERED-PRINCIPAL REGISTER
06th May 2017NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
05th May 2017ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
02th May 2017STATEMENT OF USE PROCESSING COMPLETE
21st Apr 2017TEAS STATEMENT OF USE RECEIVED
21st Apr 2017USE AMENDMENT FILED
29th Oct 2016NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
28th Oct 2016SOU EXTENSION 5 GRANTED