tm logo
CF
Dead/Cancelled
CANCELLED – SECTION 71

on 14 Oct 2022

Last Applicant/ Owned by

No. 8, Tiexincun Village

CN

Serial Number

79170154 filed on 08th Jun 2015

Registration Number

4924851 registered on 29th Mar 2016

in the Principal Register

Correspondent Address

DongLingTong IP

Building 1, No.8 Dongdaqiao Road,

Chaoyang District

Beijing

China

Filing Basis

1. filing basis filed as 66 a

Disclaimer

NO DATA

CF

The color(s) dark blue and white is/are claimed as a feature of the mark. Hydraulic pumps; hydraulic valve actuators; pumps for machines; pressure regulating valve being parts of machines; oil pumps for land vehicles; transmissions for machines; mechanical seals being machine parts The mark consists of a dark blue background with stylized white letters "CF" in it where the letter "F" is located Read More

Classification Information


Class [007]
Machinery Products


Hydraulic pumps; hydraulic valve actuators; pumps for machines; pressure regulating valve being parts of machines; oil pumps for land vehicles; transmissions for machines; mechanical seals being machine parts

Mark Details


Serial Number

No 79170154

Mark Type

No Service/Collective Mark

Attorney Docket Number

No

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

Yes

66A Current

Yes

Current Basis

No

No Basis

No

Design Code(s)

26.09.21 -

Squares that are completely or partially shaded

Description of Design Search

The mark consists of a dark blue background with stylized white letters "CF" in it where the letter "F" is located within the letter "C" with two points connected with each other.

Legal History


Show more

Status DateAction Taken
17th Feb 2024NEW REPRESENTATIVE AT IB RECEIVED
13th Aug 2023TOTAL INVALIDATION PROCESSED BY THE IB
22nd Jul 2023INVALIDATION PROCESSED
22nd Jul 2023TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
14th Jun 2023TOTAL INVALIDATION OF REG EXT PROTECTION CREATED
14th Oct 2022CANCELLED SECTION 71
29th Mar 2021COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
20th Dec 2018NEW REPRESENTATIVE AT IB RECEIVED
30th May 2018TEAS CHANGE OF CORRESPONDENCE RECEIVED
29th Jul 2016FINAL DECISION TRANSACTION PROCESSED BY IB