tm logo
BTI
Live/Registered
REGISTERED

on 02 Aug 2022

Last Applicant/ Owned by

3027 Orchard Hill

San Antonio

TX

78230

Serial Number

88206690 filed on 27th Nov 2018

Registration Number

6809229 registered on 02th Aug 2022

in the Principal Register

Correspondent Address

Edward B. Marvin

GUNN, LEE & CAVE, PC

8023 Vantage Drive

Suite 1500

SAN ANTONIO, TX 78230

Filing Basis

1. intent to use

2. use application currently

Disclaimer

NO DATA

BTI

The mark consists of the letters "B", "T" and "I", with the vertical portion of the "I" between two open doors and a person holding a door ram within the vertical portion of the "I". Metal door units, metal door frames, metal door panels BREACHING TECHNOLOGIES INC Color is not claimed as a feature of the mark.

Classification Information


Class [006]
Metal Products


Metal door units, metal door frames, metal door panels


First Use Date in General

31st Dec 2019

First Use Date in Commerce

31st Dec 2019

Mark Details


Serial Number

No 88206690

Mark Type

No Service/Collective Mark

Attorney Docket Number

No T-8899.9

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Design Code(s)

02.01.02 -

Shadows or silhouettes of men

02.01.25 -

Hunters, archers and other men with a significantly prominent weapon

03.07.10 -

Goats, sheep, rams

07.07.01 -

Doors, entrances

14.05.01 -

Hammers, gavels, mallets

27.01.01 -

Letters or numerals, including punctuation, forming representations of human beings or parts of human beings

27.01.04 -

Letters or numerals, including punctuation, forming representations of objects, parts of objects, or maps

Description of Design Search

The mark consists of the letters "B", "T" and "I", with the vertical portion of the "I" between two open doors and a person holding a door ram within the vertical portion of the "I".

Legal History


Show more

Status DateAction Taken
02th Aug 2022NOTICE OF REGISTRATION CONFIRMATION EMAILED
02th Aug 2022REGISTERED-PRINCIPAL REGISTER
30th Jun 2022NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
29th Jun 2022ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
24th Jun 2022ASSIGNED TO EXAMINER
23rd Jun 2022STATEMENT OF USE PROCESSING COMPLETE
20th Jun 2022USE AMENDMENT FILED
20th Jun 2022TEAS STATEMENT OF USE RECEIVED
24th Dec 2021NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
23rd Dec 2021SOU EXTENSION 5 GRANTED