Trademark Search
Owners
Automotive Lift Institute
ANNUAL LIFT INSPECTION THIS LIFT HAS PASSED INSPECTION IN ACCORDANCE WITH ANSI/ALI ALOIM:2020. CERTIFIED LIFT INSPECTION ALI CHECK 360 FOR TRAINING AND MAINTENANCE EVALUATION FINDINGS SEE LIFT INSPECTION REPORT ON FILE. ALI CERTIFIED INSPECTOR # AUTOMOTIVE LIFT INSTITUTE ALI CERTIFIED LIFT INSPECTOR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
final action
on 29 Jan 2024
Last Applicant/ Owned by
3699 Luker Road
Cortland
NY
13045
Serial Number
97602466 filed on 22nd Sep 2022
Registration Number
N/A
Correspondent Address
Sandra M. Koenig
Filing Basis
1. filed as use application
2. use application currently
Disclaimer
"ANNUAL LIFT INSPECTION", "THIS LIFT HAS PASSED INSPECTION IN ACCORDANCE WITH", "CERTIFIED LIFT INSPECTION", "FOR TRAINING AND MAINTENANCE EVALUATION FINDINGS SEE LIFT INSPECTION REPORT ON FILE", "CERTIFIED INSPECTOR #", "CERTIFIED LIFT INSPECTOR", "JAN", "FEB", "MAR", "APR", "MAY", "JUN", "JUL", "AUG", "SEP", "OCT", "NOV", AND "DEC"
"ANNUAL LIFT INSPECTION", "THIS LIFT HAS PASSED INSPECTION IN ACCORDANCE WITH", "CERTIFIED LIFT INSPECTION", "FOR TRAINING AND MAINTENANCE EVALUATION FINDINGS SEE LIFT INSPECTION REPORT ON FILE", "CERTIFIED INSPECTOR #", "CERTIFIED LIFT INSPECTOR", "JAN", "FEB", "MAR", "APR", "MAY", "JUN", "JUL", "AUG", "SEP", "OCT", "NOV", AND "DEC" The certification mark, as used or intended to be used by persoRead More
The mark was first used anywhere in a different form other than that sought to be registered at least as early as 01/01/2013
01st Jan 2021
01st Jan 2021
No 97602466
No Service/Collective Mark
No ALIZ 500019U
No
No
No
No
No
No
No
No
24.05.01 -
24.15.01 -
Arrows forming a circle or an arc of a circle
26.01.03 -
Incomplete circles (more than semi-circles)
26.01.08 -
Letters, numerals or punctuation forming or bordering the perimeter of a circle
26.01.17 -
Two concentric circles
26.09.14 -
Three or more squares
26.09.16 -
Squares touching or intersecting
26.17.01 -
Straight line(s), band(s) or bar(s)
The mark consists of the words ANNUAL LIFT INSPECTION in the upper right corner. Along the sides in separate blocks, reading top to bottom, are the abbreviations JAN, FEB, MAR, APR, MAY, JUN arranged in a column on the left edge, and the abbreviations JUL, AUG, SEP, OCT, NOV, DEC in a column along the right edge. In the center is a design with the letters "ALI" inside an incomplete circle. The words "CERTIFIED LIFT INSPECTION" appear outside of the incomplete circle and inside an outer concentric incomplete circle which includes an arrow at one end. Literal elements "CHECK" and "360" are shown beneath the letters "ALI" within the open sections of the concentric incomplete circles. Above this design is the language "This lift has passed inspection in accordance with ANSI/ALI ALOIM:2020." Below the design is the wording "For training and maintenance evaluation findings see lift inspection report on file." Below this wording are four horizontal line segments above the wording "ALI Certified Inspector #" and adjacent is a design comprising the words "AUTOMOTIVE LIFT INSTITUTE" arranged between concentric circles, and the letters "ALI" in the center. The word "CERTIFIED" is stacked above the words "LIFT INSPECTOR" on a banner across the lower segment of the concentric circles. The outer circle of this design is outlined by a jagged edge.
Status Date | Action Taken |
---|---|
25th Mar 2024 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
29th Jan 2024 | NON-FINAL ACTION WRITTEN |
29th Jan 2024 | NON-FINAL ACTION E-MAILED |
29th Jan 2024 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
09th Dec 2023 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
28th Nov 2023 | WITHDRAWN FROM PUB - OG REVIEW QUERY |
14th Nov 2023 | APPROVED FOR PUB - PRINCIPAL REGISTER |
24th Aug 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
24th Aug 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
24th Aug 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |