tm logo
TESNA ENERGY
Dead/Abandoned
ABANDONED - NO STATEMENT OF USE FILED

no statement of use filed

on 24 Dec 2018

Last Applicant/ Owned by

1-34-4, Kanda-sudacho, Chiyoda-ku

Tokyo 101-0041

JP

Serial Number

86967524 filed on 07th Apr 2016

Registration Number

N/A

Correspondent Address

JAMES E. HUDSON III

CRAIN, CATON & JAMES, P.C.

1401 MCKINNEY

SUITE 1700

HOUSTON, TX 77010

Filing Basis

1. intent to use

2. intent to use current

Disclaimer

"ENERGY"

TESNA ENERGY

Biomass gasification services The mark consists of the words "TESNA ENERGY" adjacent to a design made up of a continuous zig-zag line creating three connecting triangles facing different directions. Construction, installation, maintenance and repair of industrial furnaces Color is not claimed as a feature of the mark. Industrial furnaces "ENERGY"

Classification Information


Class [037]
Construction and Repair Services


Construction, installation, maintenance and repair of industrial furnaces

Class [040]
Treatment & Processing of Materials Services


Biomass gasification services

Class [011]
Environmental Control Instrument Products (lighting,heating,cooling,cooking)


Industrial furnaces

Mark Details


Serial Number

No 86967524

Mark Type

No Service Mark

Attorney Docket Number

No 083724-1

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Design Code(s)

26.17.25 -

Other lines, bands or bars

Description of Design Search

The mark consists of the words "TESNA ENERGY" adjacent to a design made up of a continuous zig-zag line creating three connecting triangles facing different directions.

Legal History


Show more

Status DateAction Taken
24th Dec 2018ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED
24th Dec 2018ABANDONMENT - NO USE STATEMENT FILED
31st May 2018NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
30th May 2018EXTENSION 3 GRANTED
30th May 2018CASE ASSIGNED TO INTENT TO USE PARALEGAL
18th May 2018EXTENSION 3 FILED
18th May 2018TEAS EXTENSION RECEIVED
21st Nov 2017NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
17th Nov 2017TEAS EXTENSION RECEIVED
17th Nov 2017EXTENSION 2 GRANTED