on 01 Oct 2019
Last Applicant/ Owned by
La Vallée Sainte-Florence
F-85140 ESSARTS EN BOCAGE
FR
Serial Number
79240514 filed on 13th Apr 2018
Registration Number
5870427 registered on 01st Oct 2019
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Dry-rot treatment of timber; preservative treatment of wood, other than painting; treatment of timber with preservatives; sawing of timber; planing of materials; woodworking; planing of timber; providing information relating to woodworking; flame proofing of non-metallic building materials made of wood; fireproofing of existing structures; fireproofing of existing buildings; treatment of materialsRead More
Non-metallic building materials, namely, wood cladding; semi-worked composite wood; semi-worked wood for building; veneer wood; sawn timber; manufactured timber; wood, semi-worked; furrings of wood; framework for building, not of metal; non-metal wainscotting; non-metal shingles; non-metallic cladding panels for building; non-metallic cladding materials for building; non-metallic cladding panels for roofs; non-metallic cladding for facades; wood posts; wood rafters; floor boards of wood; wooden decking boards for building; parquet floor boards; timber boarding, all the aforesaid goods being for interior and exterior cladding of facades; ceilings, not of metal; floors, not of metal; glue-laminated wood; non-metallic transportable buildings; canopies in the nature of shelter structures of non-metallic materials; non-metallic pergolas; arbours not of metal; swimming pools, not of metal; cabanas, not of metal; roof coverings, not of metal, for building; floorboards; fences, not of metal; path edgings made of non-metallic materials; turnstiles, not of metal; paving slabs, not of metal; non-metal railings for balconies; non-metallic balcony enclosures; garden sheds of wood; timber building boards; non-metallic sidewalls in the nature of wall panels; roof coverings, not of metal; latticework, not of metal; reinforcing materials, not of metal, for building; non-metallic shelter structures; non-metallic curtain walls; non-metallic damp course materials, namely, waterproofing membranes for roofing, floors and walls
Installation of cladding; installing fencing; placement of boards, namely, installation of floorboards and installation of wallboard; installation of gates; installation of screen walls; installation of screens; installation of windscreens; installation of pergolas; installation of garden furniture; installation of structural panels made of wood; maintenance of cladding; maintenance of fences; panel maintenance in the nature of the maintenance of wood panels; maintenance of gates; maintenance of screen walls; maintenance of screens; maintenance of windscreens; maintenance of pergolas; maintenance of garden furniture; providing construction information; building consultancy, namely, consultation regarding construction; building construction supervision; installation of building insulation; installation of insulation to existing buildings; installation of insulation into internal and external walls, ceilings and roofs; installation of fireproofing materials during construction
Dry-rot treatment of timber; preservative treatment of wood, other than painting; treatment of timber with preservatives; sawing of timber; planing of materials; woodworking; planing of timber; providing information relating to woodworking; flame proofing of non-metallic building materials made of wood; fireproofing of existing structures; fireproofing of existing buildings; treatment of materials, namely, fireproofing wood
No 79240514
No Service Mark
No 1300-744
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
14th Feb 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
24th Jan 2020 | FINAL DISPOSITION PROCESSED |
24th Jan 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
01st Jan 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
01st Oct 2019 | REGISTERED-PRINCIPAL REGISTER |
16th Jul 2019 | PUBLISHED FOR OPPOSITION |
26th Jun 2019 | NOTICE OF PUBLICATION |
10th Jun 2019 | EXAMINERS AMENDMENT MAILED |
07th Jun 2019 | APPROVED FOR PUB - PRINCIPAL REGISTER |
07th Jun 2019 | EXAMINER'S AMENDMENT ENTERED |