final action
on 17 Mar 2023
Last Applicant/ Owned by
12039 Smith Avenue
Santa Fe Springs
CA
90706
Serial Number
97709755 filed on 08th Dec 2022
Registration Number
N/A
Filing Basis
1. intent to use
2. intent to use current
Disclaimer
"POWER EQUIPMENT"
"POWER EQUIPMENT" Color is not claimed as a feature of the mark. The mark consists of the word "CHAMPION" in large upper case letters, with the wording "POWER EQUIPMENT" in smaller upper case letters below it, with a solid border around the word "CHAMPION," and an solid line beneath the words "POWER EQUIPMENT". Solar panels for the production of electricity and accessories, namely, photovoltaicRead More
Solar panels for the production of electricity and accessories, namely, photovoltaic cells and modules and solar charge controllers; Photovoltaic installations for the transformation of solar energy into electricity, namely, photovoltaic solar modules, microinverters; photovoltaic inverters and current converters; solar charge regulators; solar charge controllers; solar energy driven loading units being rechargers for loading batteries and accumulators; batteries; accessories for aforementioned goods, namely, electric cables; Monitoring equipment for photovoltaic installations, namely, voltage and current monitor modules; Electrical apparatus and instruments for the positioning of solar cells, solar modules and solar panels that are moveable in horizontal and vertical directions, namely, directional light sensors
No 97709755
No Service/Collective Mark
No 1635-066
No
No
No
No
No
No
No
No
26.11.28 -
Miscellaneous designs with overall rectangular shape
26.17.13 -
Letters or words underlined and/or overlined by one or more strokes or lines
The mark consists of the word "CHAMPION" in large upper case letters, with the wording "POWER EQUIPMENT" in smaller upper case letters below it, with a solid border around the word "CHAMPION," and an solid line beneath the words "POWER EQUIPMENT".
Status Date | Action Taken |
---|---|
17th Mar 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
17th Mar 2023 | NON-FINAL ACTION WRITTEN |
17th Mar 2023 | NON-FINAL ACTION E-MAILED |
14th Mar 2023 | EXAMINER'S AMENDMENT ENTERED |
14th Mar 2023 | EXAMINERS AMENDMENT -WRITTEN |
14th Mar 2023 | EXAMINERS AMENDMENT E-MAILED |
14th Mar 2023 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
10th Mar 2023 | ASSIGNED TO EXAMINER |
10th Jan 2023 | NOTICE OF DESIGN SEARCH CODE E-MAILED |
07th Jan 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |