on 17 Jul 2018
Last Applicant/ Owned by
12891 W. Clearview Ave
Waukegan
IL
60085
Serial Number
87255189 filed on 02th Dec 2016
Registration Number
5520339 registered on 17th Jul 2018
Filing Basis
1. intent to use
2. use application currently
Disclaimer
"CUSTOM FABRICATING SOLUTIONS"
Manufacture of general product lines in the field of metal fabrication to the order and specification of others; Metal fabrication and finishing services for others; excluding custom fabrication of pipelines and pipeline construction products Color is not claimed as a feature of the mark. "CUSTOM FABRICATING SOLUTIONS" The mark consists of the initials of the name of the company, "CFS", drawn iRead More
Manufacture of general product lines in the field of metal fabrication to the order and specification of others; Metal fabrication and finishing services for others; excluding custom fabrication of pipelines and pipeline construction products
05th Jan 2017
05th Jan 2017
Engineering
05th Jan 2017
05th Jan 2017
No 87255189
No Service Mark
No
No
No
No
No
No
No
No
No
14.03.02 -
Nails, screws, nuts, bolts, washers, eyelets, rivets, dowel pins, thumb tacks, railroad spikes
26.11.16 -
Rectangles touching or intersecting
26.11.25 -
Rectangles with one or more curved sides
The mark consists of the initials of the name of the company, "CFS", drawn in a way to represent the letters as if they were constructed out of coped metal tubing. The initials, "CFS", are separated by stylized periods made to represent button head bolts. Underneath the initials, the company name, "CUSTOM FABRICATING SOLUTIONS", is written in a bold stylized all caps font. Both the initials, "CFS", and company name, "CUSTOM FABRICATING SOLUTIONS", are surrounded by a bold 3D outline graphic made to represent metal bars.
Status Date | Action Taken |
---|---|
17th Jul 2018 | REGISTERED-PRINCIPAL REGISTER |
15th Jun 2018 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
14th Jun 2018 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
14th Jun 2018 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
14th Jun 2018 | SU - NON-FINAL ACTION - WRITTEN |
14th Jun 2018 | NON-FINAL ACTION E-MAILED |
05th Jun 2018 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
04th Jun 2018 | STATEMENT OF USE PROCESSING COMPLETE |
04th Jun 2018 | EXTENSION 1 GRANTED |
26th Apr 2018 | NOTICE OF REVIVAL - E-MAILED |