failure to respond or late response
on 03 Jan 2017
Last Applicant/ Owned by
I-33050 MORTEGLIANO (UD)
IT
Serial Number
79186148 filed on 12th Feb 2016
Registration Number
N/A
Filing Basis
No Filing Basis
Disclaimer
NO DATA
Buildings materials (non-metallic), including building components that are ready to be fitted, windows, including skylights, windows of synthetic/plastic materials, sections of windows, roof terraces, roof balconies, superstructures of glass, tubular skylights, flashing, internal coverings for windows, shutters, blinds, roller blinds, outdoor blinds; parts and fittings for all of the aforesaid gooRead More
Common metals and their alloys; transportable metallic constructions; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores; building materials of metal, containers, tanks, tubes and pipes, blinds, roller blinds, shutters, roller shutters, boxes for roller blinds and shutters, operating devices for blinds, roller blinds, shutters and roller shutters, parts and accessories (not contained in other classes) for all the aforesaid goods, all the aforesaid goods of metal or manufactured by using metal
Buildings materials (non-metallic), including building components that are ready to be fitted, windows, including skylights, windows of synthetic/plastic materials, sections of windows, roof terraces, roof balconies, superstructures of glass, tubular skylights, flashing, internal coverings for windows, shutters, blinds, roller blinds, outdoor blinds; parts and fittings for all of the aforesaid goods (not included in other classes), all of the aforesaid goods not being of metal
Installation, maintenance and repair of ironmongery goods
No 79186148
No Service Mark
No
No
No
No
No
No
No
No
No
Status Date | Action Taken |
---|---|
19th Jan 2018 | FINAL DECISION TRANSACTION PROCESSED BY IB |
03rd Jan 2018 | FINAL DISPOSITION NOTICE SENT TO IB |
03rd Jan 2018 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
13th Oct 2017 | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB |
27th Sep 2017 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |
27th Sep 2017 | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB |
03rd Jan 2017 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
03rd Jan 2017 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
24th Jun 2016 | REFUSAL PROCESSED BY IB |
06th Jun 2016 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |