failure to respond or late response
on 02 Feb 2021
Last Applicant/ Owned by
215 W. Bandera Rd.
Boerne
TX
78015
Serial Number
88881840 filed on 22nd Apr 2020
Registration Number
N/A
Correspondent Address
ASSOCIATED CONSTRUCTION PARTNERS, LTD.
Filing Basis
1. use application currently
Disclaimer
NO DATA
Construction of water and wastewater treatment plants and distribution systems for municipalities, water authorities, and private industry; Rehabilitation work surrounding water and wastewater treatment equipment and distribution systems, including piping, concrete structures, controls, electrical, instrumentation, lift stations, and pumps The mark consists of the letters ACP. Four separate shapeRead More
Construction of water and wastewater treatment plants and distribution systems for municipalities, water authorities, and private industry; Rehabilitation work surrounding water and wastewater treatment equipment and distribution systems, including piping, concrete structures, controls, electrical, instrumentation, lift stations, and pumps
02th Mar 2020
02th Mar 2020
No 88881840
No Service Mark
No
No
No
No
No
No
No
No
No
The mark consists of the letters ACP. Four separate shapes with radius and straight lines are utilized to make a modern style design that spells ACP. The A is made of two shapes the larger shape makes the apex of the A and swoops downward to make the bottom of the C. The smaller shape of the A is level with the bottom of the design and makes up the horizontal portion of the A. The letter C is made with two shapes. The large part of the letter A makes up the bottom portion of the letter C. The second shape making up the letter C makes up the top portion and is drawn on a radius. The Letter P is made utilizing one shape that utilizes straight lines and radius to form a P with upper straight portion missing.
Status Date | Action Taken |
---|---|
03rd Feb 2021 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND |
02th Feb 2021 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
17th Jul 2020 | NON-FINAL ACTION E-MAILED |
17th Jul 2020 | NON-FINAL ACTION WRITTEN |
17th Jul 2020 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
15th Jul 2020 | ASSIGNED TO EXAMINER |
30th Apr 2020 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |