failure to respond or late response
on 26 Apr 2018
Last Applicant/ Owned by
Sansha Village, Henglan Town
Zhongshan
CN
Serial Number
87437875 filed on 05th May 2017
Registration Number
N/A
Filing Basis
1. use application currently
Disclaimer
NO DATA
The mark consists of the stylized wording "POERSI", with a stylized flame above the letter "I". The wording "POERSI" has no meaning in a foreign language. Color is not claimed as a feature of the mark. Light bulbs; Lamps; Chandeliers; Ceiling lights; electric Chinese lanterns; fairy lights for festive decoration; Stage light fixtures, namely, theatrical stage lighting apparatus; Lamp casings; SRead More
Light bulbs; Lamps; Chandeliers; Ceiling lights; electric Chinese lanterns; fairy lights for festive decoration; Stage light fixtures, namely, theatrical stage lighting apparatus; Lamp casings; Sockets for electric lights; Miners' lamps; Aquarium lights; Lighting apparatus and installations, namely, lighting installations; Luminous tubes for lighting; electric torches for lighting; flashlights; searchlights; Diving lights; Light-emitting diodes lighting apparatus, namely, LED light machines, LED lighting fixtures for use in display, commercial, industrial, residential, and architectural accent lighting applications
05th Nov 2016
07th Dec 2016
No 87437875
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
01.15.15 -
Flames emanating from objects, numbers or words
26.17.09 -
Curved line(s), band(s) or bar(s)
The mark consists of the stylized wording "POERSI", with a stylized flame above the letter "I".
Status Date | Action Taken |
---|---|
26th Apr 2018 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |
26th Apr 2018 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
15th Sep 2017 | NOTIFICATION OF FINAL REFUSAL EMAILED |
15th Sep 2017 | FINAL REFUSAL E-MAILED |
15th Sep 2017 | FINAL REFUSAL WRITTEN |
11th Sep 2017 | TEAS/EMAIL CORRESPONDENCE ENTERED |
11th Sep 2017 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
11th Sep 2017 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
03rd Aug 2017 | ASSIGNED TO EXAMINER |
03rd Aug 2017 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |