tm logo
CONTRACTOR TOUGH
Live/Registered
REGISTERED

on 21 Sep 2021

Last Applicant/ Owned by

819 S. 5th Street

Paragould

AR

72450

Serial Number

87117073 filed on 26th Jul 2016

Registration Number

6493481 registered on 21st Sep 2021

in the Principal Register

Correspondent Address

Stephen D. Carver

Patent Law Offices of Stephen D. Carver

2024 Arkansas Valley Drive

Suite 800

Little Rock, AR 72212

Filing Basis

1. intent to use

2. use application currently

Disclaimer

"CONTRACTOR"

CONTRACTOR TOUGH

Concrete construction machines; concrete finishing machines; concrete paving machines, screed cart in the nature of cart for transporting a concrete screed, powered material handling equipment, namely, powered concrete buggies, powered wheeled buggies, powered tracked buggies, and powered tracked dumpers; concrete construction machines, namely, vibratory concrete screeds and strike-offs, floating Read More

Classification Information


Class [007]
Machinery Products


Concrete construction machines; concrete finishing machines; concrete paving machines, screed cart in the nature of cart for transporting a concrete screed, powered material handling equipment, namely, powered concrete buggies, powered wheeled buggies, powered tracked buggies, and powered tracked dumpers; concrete construction machines, namely, vibratory concrete screeds and strike-offs, floating screed and strike-offs, truss screeds, wet screeds, powered screeds, triangular truss vibratory concrete screed machines; powered walk behind trowels; powered riding trowels; rotary power trowels, power trowels


First Use Date in General

10th Jan 2019

First Use Date in Commerce

10th Jan 2019

Mark Details


Serial Number

No 87117073

Mark Type

No Service/Collective Mark

Attorney Docket Number

No 21009

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Legal History


Show more

Status DateAction Taken
21st Sep 2021REGISTERED-PRINCIPAL REGISTER
20th Aug 2021NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
19th Aug 2021ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
14th Aug 2021STATEMENT OF USE PROCESSING COMPLETE
14th Aug 2021CASE ASSIGNED TO INTENT TO USE PARALEGAL
05th Aug 2021USE AMENDMENT FILED
05th Aug 2021TEAS STATEMENT OF USE RECEIVED
02th Mar 2021NOA E-MAILED - SOU REQUIRED FROM APPLICANT
05th Jan 2021OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
05th Jan 2021PUBLISHED FOR OPPOSITION