final action counted
on 01 Apr 2024
Last Applicant/ Owned by
E-03460 Benejama, Alicante
ES
Serial Number
79386042 filed on 21st Jul 2023
Registration Number
N/A
Filing Basis
1. filing basis filed as 66 a
Disclaimer
NO DATA
Structural support elements (non-metallic); Structural support elements (non-metallic), in particular for solar panels; transportable structures, not of metal; structures made of non-metallic materials; civil engineering structures (non-metallic); floating civil engineering structures (non-metallic); transportable buildings and structures, not of metal; brackets, not of metal, for building; thermoRead More
Structural support elements (non-metallic); Structural support elements (non-metallic), in particular for solar panels; transportable structures, not of metal; structures made of non-metallic materials; civil engineering structures (non-metallic); floating civil engineering structures (non-metallic); transportable buildings and structures, not of metal; brackets, not of metal, for building; thermoplastic floating mount for photovoltaic panels
Solar cells; photovoltaic cells; crystalline silicon solar power cells; solar panels; photovoltaic inverters; solar cells for electricity generation; photovoltaic installations for generating electricity [photovoltaic power plants]; photovoltaic apparatus for converting solar radiation to electrical energy; photovoltaic apparatus and installations for generating solar electricity; photovoltaic solar panels; solar panels for the production of electricity; electric control devices for energy management; energy control devices; energy regulators; software; application programs; home automation software; wet cells; battery packs; electric batteries; uninterruptible power supply apparatus [batteries]; battery chargers; chargers for electric cars
No 79386042
No Service/Collective Mark
No
No
No
No
No
Yes
Yes
No
No
01.15.08 -
A single drop (including a single raindrop or a single teardrop)
05.03.25 -
Other leaves
Status Date | Action Taken |
---|---|
02th Apr 2024 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
01st Apr 2024 | NON-FINAL ACTION WRITTEN |
26th Mar 2024 | ASSIGNED TO EXAMINER |
02th Jan 2024 | APPLICATION FILING RECEIPT MAILED |
27th Dec 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
21st Dec 2023 | SN ASSIGNED FOR SECT 66A APPL FROM IB |