on 05 Apr 2022
Last Applicant/ Owned by
Xinsha Road, Shajing, Baoan District
Shenzhen
CN
518104
Serial Number
90164528 filed on 08th Sep 2020
Registration Number
6695153 registered on 05th Apr 2022
Filing Basis
1. filed as use application
2. use application currently
Disclaimer
NO DATA
Color is not claimed as a feature of the mark. Air distribution units for pneumatically driven pumps; Air filters for pneumatic controls being part of machines; Electrical and electronic apparatus and equipment all for use in generating energy obtained from alternative energy sources; Gas diverters consisting of a pump, storage and refilling tank, pre-heater, vaporizer, recuperator, condenser andRead More
Air distribution units for pneumatically driven pumps; Air filters for pneumatic controls being part of machines; Electrical and electronic apparatus and equipment all for use in generating energy obtained from alternative energy sources; Gas diverters consisting of a pump, storage and refilling tank, pre-heater, vaporizer, recuperator, condenser and valves; Industrial surface treatment equipment, namely, corona treatment systems comprised of a high frequency, high voltage generator, transformers, electrodes, ozone filter and treatment station and structural parts therefor; Machinery, namely, vacuum distillation equipment; Pneumatic pumps; Water treatment equipment, namely, pumps for use in irrigation systems; Electrolysis apparatus for electroplating
01st Oct 2021
01st Oct 2021
No 90164528
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
26.17.13 -
Letters or words underlined and/or overlined by one or more strokes or lines
The mark consists of the wording "INNOKIN" in stylized format.There is a straight line above and below the letters.
Status Date | Action Taken |
---|---|
05th Apr 2022 | REGISTERED-PRINCIPAL REGISTER |
02th Mar 2022 | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED |
01st Mar 2022 | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED |
29th Jan 2022 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
29th Jan 2022 | STATEMENT OF USE PROCESSING COMPLETE |
14th Jan 2022 | TEAS STATEMENT OF USE RECEIVED |
14th Jan 2022 | USE AMENDMENT FILED |
26th Oct 2021 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
31st Aug 2021 | PUBLISHED FOR OPPOSITION |
31st Aug 2021 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |