section 8
on 01 Apr 2022
Last Applicant/ Owned by
181, 2-ka, Hangang-ro, Yongsan-ku
Seoul
KR
Serial Number
86106743 filed on 31st Oct 2013
Registration Number
4815633 registered on 22nd Sep 2015
Correspondent Address
ANDY I. COREA
Filing Basis
1. intent to use
Disclaimer
THE UNIVERSAL RECYCLING SYMBOL
The mark consists of three green arrows, each arrow pointing to the next, forming a circular flower design above two petals, with the wording "GREENCYCLE" appearing below the design; the coloring of the letters is as follows: the "G", second "E", and "N" are in light green, and the rest of the lettering is in dark green. GREEN CYCLE Cosmetic preparations for bath and shower; Cosmetic preparationRead More
Cosmetic preparations for bath and shower; Cosmetic preparations for body care; Cosmetic preparations for skin care; Cosmetic sunscreen preparations; Cosmetics; Dentifrices; Hair shampoo; Make-up preparations; Perfume; Pet shampoo
No 86106743
No Service/Collective Mark
No 05443-T0003A
No
No
No
No
No
No
No
No
05.03.08 -
More than one leaf, including scattered leaves, bunches of leaves not attached to branches
05.05.25 -
Other flowers including daffodils and irises
24.15.01 -
Arrows forming a circle or an arc of a circle
24.17.19 -
Recycling symbol
The mark consists of three green arrows, each arrow pointing to the next, forming a circular flower design above two petals, with the wording "GREENCYCLE" appearing below the design; the coloring of the letters is as follows: the "G", second "E", and "N" are in light green, and the rest of the lettering is in dark green.
Status Date | Action Taken |
---|---|
01st Apr 2022 | CANCELLED SEC. 8 (6-YR) |
22nd Sep 2020 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
22nd Sep 2015 | REGISTERED-PRINCIPAL REGISTER |
07th Jul 2015 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
07th Jul 2015 | PUBLISHED FOR OPPOSITION |
17th Jun 2015 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
03rd Jun 2015 | NOTICE OF ALLOWANCE CANCELLED |
03rd Jun 2015 | ATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED |
03rd Jun 2015 | PETITION TO DIRECTOR - CHANGE BASIS - GRANTED |
26th May 2015 | ASSIGNED TO PETITION STAFF |